2-4 Weeks Lead-Time
After learning that his local stone fabricator was a third generation terrazzo installer, Christopher Stuart wanted to do a series that utilized their process. He first makes a metal structure that will form the legs and give the terrazzo a framework to bond to. These are much like the metal dividers you’d see in a terrazzo floor made from brass or aluminum. A block is poured and ground back to reveal the aggregate and metal legs. Each one is unique. The epoxy is suitable for outdoors.
Technical Specifications
Designer
Lead Time
2-4 Weeks
Origin
United States
Production
One of a Kind
Date
2016
Materials
Aluminum and Epoxy Terrazzo.
Dimensions
W 16" x D 16" x H 19.5"