This desk was part of the entire study. The idea for the work table, apart from being archetypal, is that there is a frame under the top under which (drawer) blocks can be placed as desired.
8-10 Weeks Lead-Time
This desk was part of the entire study. The idea for the work table, apart from being archetypal, is that there is a frame under the top under which (drawer) blocks can be placed as desired.
8-10 Weeks Lead-Time
1 In-Stock
8-10 Weeks
The Netherlands
Made to Order
1998
Steel, Plywood & Linoleum
L 94.5" x W 63" x H 30.7"
This item is part of our Quick Ship program and ships directly from the vendor. Availability is limited and subject to change.
Price may vary due to applicable tariffs. See terms and conditions for details.
Sign up for our mailing list and receive updates on the latest launches and exhibitions